The Marina Thermal Project

The Marina Thermal Facility is a 26,000 square-foot central utility plant located in Atlantic City's Renaissance Pointe. Owned by Marina Energy and operated by DCO Energy, this Greenfield development project emphasizes the long-term vision of creating, in phases, a District heating and cooling system that will serve anticipated casino expansion within the Renaissance Pointe area.

1
2
3
4

Frederick County, MD Landfill Gas to Energy Project

The Northeast Maryland Waste Disposal Authority has contracted FC Landfill Energy LLC, to design, construct, own, operate and maintain a 2.1MW Landfill Gas to Energy Facility located at the Reich's Ford Road landfill in Frederick County Maryland.

FC Landfill Energy LLC is a wholly owned subsidiary of Energenic, a partnership between long-term business partners Marina Energy and DCO Energy.

The Project consists of installing the landfill gas collection system in cell area 2 of the landfill, two (2) - Jenbacher J-320 Engine Generator Sets, radiators, gas blower skid, high voltage electrical distribution and switchgear equipment, controls and interconnection piping and wiring.

The system will be interconnected to Allegheny Power and all energy generated will be sold to the PJM Power grid.

Details
Client: Northeast Maryland Waste Disposal Authority
Location: Reich's Ford Road Landfill, Frederick County. MD
Services: Design, construct, own, operate and maintain
Commercial Operation: Anticipated June 2010
Capacity: 2.1 MW
Developer: FC Landfill Energy, LLC